Abstract versions of the designs I produced for a city-wide surveillance project. Equipment models, quantities, locations and node names are replaced with generic labels. Values marked as illustrative are examples of the method.

Technical design

Network topology

How the site nodes and their edge devices (CCTV, ground surveillance radar, ANPR, barriers) connect to the core network, data center and control room.

Perimeter firewallsredundant pairCore switchesredundant pairArchivestorageHCI clusterVMS · recordingAggregation stackstacked access switchesData center switchesserver fabricManagement appliancesNAC · monitoring · FW mgmtServer access switchOperatorworkstationsRecordingserversSite nodesedge switch per node · UPS-backedEdge devices on each site nodeCCTVGSRANPRBarrierThermalPTZsingle-mode fiber to each node
FiberCopperRedundant coreGSR · ground surveillance radar
InputNode list, device schedule, client security requirements
DecisionsRedundant core and firewalls, one edge switch per site node, separate recording paths by device type
Used forEquipment BOQ, rack layouts, vendor configuration scope
Technical design

Rack layouts

Four 42U racks: field fiber termination and aggregation, two mirrored core racks, and recording servers. Each rack carries its own power and heat table.

Rack 1 · field terminationFiber patch panelFiber patch panelFiber patch panelFiber patch panelAggregation switchAggregation switchAggregation switchAggregation switchRack 2 · core AFiber patch panelsCore switchDC switchHCI serverHCI serverArchive nodeMgmt appliancesFirewallRack 3 · core BFiber patch panelsCopper patch panelsCore switchDC switchHCI serverArchive nodesMgmt appliancesFirewallRack 4 · recordingWorkstation patch panelRecording serverRecording serverRecording serverRecording serverRecording serverRecording server
Patch panelsSwitchingServers and storageManagementCore and security
InputTopology, port counts, device dimensions
ChecksRack units, fiber and copper terminations, power and heat per rack
Used forInstallation, cabling plan, HVAC and UPS sizing
Technical design

Fiber schedule

Each node gets a dedicated core pair from the control room, with distances, a 20% safety margin and the optic type chosen by link length.

#RouteFromNodeCore pairDistance (m)Segment (m)+20% margin (m)Optic
1Route ACRN-011–21,1501,1501,380BiDi 10 km
2Route ACRN-023–41,195451,434BiDi 10 km
3Route ACRN-035–61,270751,524BiDi 10 km
4Route ACRN-047–81,325551,590BiDi 10 km
………………………
31Route BCRN-3161–6211,94021014,328BiDi 40 km
Route length, all nodesL
With 20% safety margin1.2 × L
Cable available on drumsS
Balance to order or surplusS − 1.2 × L
InputRoute survey, node positions, cable type
ChecksCumulative and segment distances, optic reach, cable on hand vs required
Used forCable ordering, splicing plan, SFP selection
Technical design

Node allocation, throughput and power

Every device is allocated to a node with its bitrate and power draw. Per-node totals size the uplinks and the node UPS; the full list rolls up into storage and recording.

NodeDeviceIDBitrate (Mbps)Power (W)Source
N-016MP bulletB6-011013PoE
N-016MP bulletB6-021013PoE
N-012MP PTZPTZ-01825PoE
N-01Edge switchSW-01–170UPS
N-01 total28221
Device typeBitrate (Mbps)Power (W)Supply
6MP bullet1013PoE
5MP bullet88PoE
2MP bullet88PoE
2MP PTZ825PoE+
Edge switch–170UPS
N-0128N-0230N-0320N-0430N-0530N-0646N-0718N-0838Mbps per node (illustrative)
InputDevice schedule and datasheets
ChecksBitrate per node and per route, PoE budget per switch, UPS load per node
Used forSwitch selection, uplink sizing, UPS and power cable sizing, storage sizing
Technical design

Coverage design

Camera placement along a road segment: each node covers the road ahead, selected nodes also cover behind, and narrower cameras close the route ends.

N-01N-02N-03N-04N-05N-06N-07N-08N-09N-10N-11Type A · 45° · forwardType A · 45° · forward + backType B · 30° · end of routeRange set per camera type at a target pixel density (px/m)
InputRoad alignment, pole positions, camera fields of view
ChecksOverlap between nodes, range at the target pixel density, blind spots
Used forPole placement, camera selection and aiming
Technical design

Control room and data center draft

Draft layout for the temporary control room and rack room, with operator sightlines to both video walls, plus the power and heat basis handed to the mechanical engineer.

Rack roomTemporary control roomVideo wall AVideo wall BSupervisorOperator desksSection · operator sightlineangles checked to wall top and bottom
GroupAvg load (kW)Max load (kW)Heat at max (BTU/hr)
Operator workstations8.913.044,000
Desk and wall monitors6.97.024,000
Video walls0.92.711,000
Room total16.722.779,000
Max IT load22.7 kW
× 3.412 BTU/hr per W79,000 BTU/hr
+25% design margin28.3 kW
Cooling to specify≈ 8.5 tons
InputRoom survey, device list, operator count
ChecksViewing angles, circulation, rack clearances, worst-case load
Used forFit-out, HVAC sizing, electrical supply sizing

All diagrams are redrawn abstractions. No client, site, model or quantity data from the original documents is shown, except where marked as illustrative.