Redrawn versions of the network, fiber, data center, pole and power designs, the field documents and the schedule, across five highway projects. Equipment families are named; site names, quantities per site and branding are left out.
MPLS WANPoint-to-multipoint wireless base stations
Surveillance
80–320 MP panoramic camerasLaser PTZ20 MP and 8 MP fixedNVRs with storage expansionsVMS / control center
Fiber
Air-blown fiber (ABF)7-way and 1-way 14/10 mm microducts144- and 96-core micro cablesSplice closures and ODFsOTDR testing
Power and site
Outdoor 1 kVA UPSStabilizers and protection unitsPole earthingRaised-floor data centerVideo walls
Technical design
Network SLD: dual-homed, redundant core
Every camera connects to two distribution switches. A redundant core pair links cameras, recorders and operators. Recording traffic stays on its own switches.
ChecksUplink capacity per switch, traffic direction, playback load
Used forUplink speeds, core sizing, questions to the vendor
Technical design
Port mapping
Every switch port mapped to its device, VLAN, link type and optic, which also gives the transceiver order.
Switch
Port
VLAN
Destination
Port
Link
Optic
Camera dist. A
1
1
Panoramic camera 01
1
10G SM
SFP-10G-ER
Camera dist. B
1
1
Panoramic camera 01
2
10G SM
SFP-10G-ER
Camera dist. A
23
1
Field switch, PTZ node 01
Uplink 1
1G SM
GLC-BX40
Recording dist. A
1
1 + 2
NVR 01
1 & 2
10G MM
SFP-10G-SR
Core A
49
trunk
Camera dist. A
Uplink
40/100G MM
QSFP-40/100-SRBD
InputSLD and device list
ChecksPort counts, VLANs, link type and optic reach
Used forSFP ordering, installation, configuration
Technical design
Fiber design and air-blown fiber
Two patterns from the control room: a star of 144-core cables with 4 cores per node, and a ring of two 96-core cables for redundancy.
Nodes on cablen
Cores per node4
Used cores4 × n
Spare cores144 − 4n
InputRoute survey, node list, cable stock
ChecksCore allocation, spare cores, splice count, duct capacity, link budget
Used forCable and microduct order, splicing plan, ABF works
Technical design
Data center layout and rack heat
Raised-floor data center with recorder racks grouped by road and a network row. Each rack has a power and heat table within the client limit on units per rack.
Rack item
Qty
W each
Total W
BTU/hr
NVR, large
2
750
1,500
5,115
NVR, standard
4
500
2,000
6,820
Rack fans with thermostat
1
760
760
2,592
Rack total
4,260
14,527
InputRecorder and expansion counts, device power
ChecksUnits per rack, kW and BTU/hr per rack, airflow
Used forRack order, HVAC brief, cabling plan
Technical design
Integration with the existing control room
The new network ties into the existing monitoring centre over fiber, with an MPLS WAN to remote sites and wireless links from towers to PTZ cameras.
InputExisting network, remote sites, towers
DecisionsFiber between buildings, WAN for remote sites, wireless where fiber cannot reach
Used forInterfaces with the operator and the existing integrator
Technical design
Pole designs and components
Two pole types with a standard installation model: enclosure high on the pole, UPS at the base, and separate routes for power, fiber and UTP inside the pole.
Component
Role on the pole
Panoramic camera (80 to 320 MP)
Wide-area coverage from one pole; 10G fiber to distribution
PTZ camera (laser IR)
Detail and tracking; 24 V DC supply
Fixed 20 MP / 8 MP camera
Spot coverage; 12 V DC supply, IR illuminator
Outdoor camera housing
Weather protection for fixed cameras
Cleaning system
Washer tank and pump for camera windows; 24 V AC supply
Industrial field switch
PoE and fiber uplink for PTZ and fixed cameras
Outdoor UPS 1 kVA
Ride-through for every node
Stabilizer
Clean supply from an unstable feed
Protection unit
MCB and surge protection at the incomer
Outdoor enclosure / 9U rack
PDU, PSUs, splice tray and switch
InputCamera mix per pole, mounting heights
ChecksArm length, clearances, enclosure and UPS dimensions
Used forPole fabrication, installation guide, works approvals
Technical design
Pole power SLD and earthing
Power chain from the utility feed to each device on the pole, and the earthing detail for every pole.
Step-by-step guides I wrote for the panoramic cameras, with an Arabic version for site teams, so every unit is received, checked and installed the same way.
Unpacking guide
Photograph both packages and check for shipping damage
Check package contents against the list (camera, console, cables, tubes, seals)
Safety notes: three people, never lift by sunshields, cables or tubes
Cut straps, remove the box sides and edge protectors
Open the wooden crate and rotate it 90°
Remove protective foams and the upper sunshield
Release the camera from the console and lay it on its foam
Remove the console for mounting
External visual check
Record serial number and IP address on the checklist
Installation guide
Mount the console on the pole arm
Hang the camera on the console
Remove the port cover
Connect fiber and network
Insert dehumidifier packets
Refit the port cover
Connect the power cable
Fit the water filling tube
Fill the washer tank
Check wiper blades
Connect to the network or directly to the recorder
Register the camera in the VMS
Field document
Works approval checklist
Per-location checklist submitted for approval after installation: every device with model, serial and status, plus civil works.
#
Item at location
Model / serial
Status
Notes
1
20 MP fixed camera
…
OK / NO
2
Panoramic camera
…
OK / NO
3
PTZ camera
…
OK / NO
4
Industrial field switch
…
OK / NO
5
Stabilizer
…
OK / NO
6
Outdoor UPS 1 kVA
…
OK / NO
7
Protection unit
…
OK / NO
8
PSU 12 V DC, fixed camera
…
OK / NO
9
PSU 24 V AC, washer system
…
OK / NO
10
PSU 24 V DC, PTZ camera
…
OK / NO
11
Civil works
…
OK / NO
Project document
Project schedule
One road project of about four months: supply, civil and fiber works, pole installation, splicing and testing, active equipment and control room, then testing and camera field-of-view adjustment.
Start depended on two conditions: a power source at every pole from the governorate, and supply and installation of the active network by the network integrator.
ToolMS Project, one schedule per road
StructureSupply, civil and infrastructure, fiber, poles, active equipment, control room, testing
Used forClient reporting, subcontractor planning, resource loading
All diagrams are redrawn abstractions. Equipment families are named; site names, per-site quantities and company branding are not shown.